Waterproof Rating: | IPX-2 |
---|---|
Warranty: | 1-year |
Condition: | New |
Certification: | ISO 9001:2008, CE |
Automation: | Automatic |
Suitable for: | Carbon Steel, Stainless Steel |
Samples: |
---|
Customization: |
---|
Suppliers with verified business licenses
Automatic Rebar bending machine |
||||
Model | GW42-1 | GW42D | GW55D | |
Net Weight | 266kgs | 365kgs | 595kgs | |
Packing size | 1020*825*950 mm | 920*950*950 mm | 1280*1130*1290 mm | |
Maximum bend diameter | Q235 steel | 40mm | 42mm | 55mm |
C45 steel | 32mm | 36mm | 45mm | |
Rotation speed of working disc | 5-15r/min | 7-12r/min | 7-8r/min | |
Power of motor | 3kw-4hp (Common motor) | 3kw-4hp (Break motor) | 4kw-5.5hp (Break motor) | |
Voltage | 380 V | 380 V | 380 V | |
Bend control way | Automatic | Automatic | Automatic | |
Structure of reduction gearbox | gear type (steel) | gear type (steel) | gear type (steel) |
FACTORY |
PACKAGE |
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|
Suppliers with verified business licenses