Customization: | Available |
---|---|
Type: | Concrete Vibrator |
Shotcrete Type: | Wet |
Still deciding? Get samples of US$ 40/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
220V Construction Machinery Electric Motor Concrete Vibrator Factory Custom
The weight is only 5.5KGS for one set,It's very light and very convenience for operation
Product Uses |
This compact, hand-held, electric-powered portable concrete vibrator is a truly portable one-man operation. It is ideal for bridge decks, culverts and any other "hard-to-reach" remote concrete construction site. It is also ideal as an emergency standby vibrator in case of power failure on the job site.
Product Description |
1. Convenient and comfortable to operate due to the design of the motor and light waight
2. Double-insulation for the motor enhance the safe operation greatly
3. Working with the single phase power supply, very suitable for individual use.
Specification Date |
Technical Parameters: |
||||||
MODEL |
ZID-35 |
|||||
Power |
800W |
|||||
Voltage |
220V /110V |
|||||
Vibrating speed |
5600RPM |
|||||
Weight |
2.3kgs |
|||||
Packing size |
45*35*33cm (10pcs) |
|||||
Match handy shaft: |
||||||
MODEL |
ZX-25 |
ZX-25 |
ZX-25 |
ZX-35 |
ZX-35 |
ZX-35 |
Dia of vibrator head |
27mm |
27mm |
27mm |
35mm |
35mm |
35mm |
Length |
1.0M |
1.5M |
2.0M |
1.0M |
1.5M |
2.0M |
Weight |
2.35 |
2.93 |
3.51 |
3.14 |
3.92 |
4.7 |
Inspection for Main Spare parts |
Assembly & Packing
|
FACTORY |
SAMPLE ROOM |
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|