Customization: | Available |
---|---|
Warranty: | 1-year |
Condition: | New |
Still deciding? Get samples of US$ 770/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PRODUCT DESCRIPTION |
Gears,gear shafts,working disk,stop gauge,saddles,pile heads and pile head bushes made of high-quality 45# steel with proper heat treatment(quenching/tempering/high frequency)and 3mm thick external case to ensure high performances also under heavy loads and long working life.
•Dust proof brake motor and two limit switch to ensure the accuracy of the bending angle also after stopping and restarting.
•Insert pin type disk and movable saddles for a precise adjusting of the bending angle.
SPECIFICATION DATE |
MODEL/OPERATION | GW42E Automatic (Brake motor) | |
TENSILE STRENGTH | Kg/mm2 45 | Kg/mm2 65 |
STEEL BAR DIAMETER | 6-40mm | 6-32mm |
MOTOR POWER | 3 KW-4.0HP | 3-Phase 380V /50Hz |
SPEED OF WORKING DISK | 5-15 R/min | |
WEIGHT | 290 Kg. | |
DIMENSIONS (L*W*H) | 950*850*990 mm | |
CERTIFICATION |
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|