2025 New China supplier Gewilson Walk behind Diesel Concrete Cutter
2025 New China supplier Gewilson Walk behind Diesel Concrete Cutter
Product Description
For compaction of granular materials and mixed materials with some cohesive content, and hot or cold asphalt in confined areas such as parking lots, hightway and bridge construction, next to structures, curbs, and abutments.
Features
1. Excellent cutting and directional stability:
The optimal position of the machine's center of gravity enables smooth cutting and directional stability, which helps to ensure the cutting quality and accuracy during the operation process.
2. High economic efficiency:
The reduced lateral wear of the cutting blade leads to high economic efficiency, reduces the use cost, and improves the overall benefit.
3. Efficient and economical blade drive:
Equipped with a heavy-duty belt tightener, the cutting blade drive is efficient and economical. It not only extends the service life of the blade but also reduces the maintenance cost, reducing the subsequent efforts and expenses for maintenance.
4. Large-capacity adjustable water tank:
It has a large integrated and removable water tank. The filling opening is oversized, which facilitates the water filling operation. Moreover, it is equipped with an adjustable sprinkling system and has a large capacity, which can better meet the water demand for dust reduction and other aspects in the cutting operation.
Production Line of Concrete Cutter in Factory:
Parameters
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|