Hot Sell !! Diesel Concrete Floor Saw with 500mm Blade
The Diesel Concrete Floor Saw QF-500 , It is lightweight and simple to operate. With a maximum cutting depth of 180mm .The machine is well suited for used on the concrete or asphalt floor .It comes with a polyurethane plastic water tank that is able to withstand wear and easy to be replaced.
1. A variety of conrete,asphalt pavement,plaza stretching cutting
2. Concrete,asphalt pavement repairs cutting
3. All kinds of concrete cutting,grooving
These Concrete cutter offer a cutting performance second to none in this class of machines. The torque transmitted to the diamond blade and the center of gravity located directly over the cutting shaft have been matched so efficiently, that the majority of the engine's power output goes there where it is needed: into the asphalt or the concrete. These two features result in cuts up to 20 per cent faster than comparable products.
MODEL: |
QF-500 |
ENGINE type |
Single-cylinder,4-stroke,air-cooled,OHV,Gasoline enigne |
ENGINE Model |
Petro engine, HONDA GX390 |
Petro engine, LIFAN 188F |
Diesel engine , KAMA 186F |
POWER(HP) |
13.0HP |
13.0HP |
9.0HP |
Cutting Deepth |
150 mm ~ 170mm |
Dia of blade |
450mm ~500mm |
Running speed |
3200 rpm |
Depth Adjustment |
Handle Rotating |
Driving |
Manual Push |
Water Tank Capacity |
30L |
G.W./N.W. |
142kgs/120kgs |
packing size |
98*61.5*108 cm |
Optional Engine:
1.B&S 13.0HP
2.Kohler CH440 14HP
Detailed Photos
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|