Customization: | Available |
---|---|
Type: | Rammer Compactor |
Working Method: | Vibration |
Still deciding? Get samples of US$ 357.5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Powerful Design Construction Machinery C80 Plate Compactor
Product Uses |
Vibrating plate compactor and lastest design in plate compactors,suitable for sand, gravel, grit, granular materials in the areas of construction, civil or road engineering gardening.etc most of compaction work. Even brick paving compaction (with optional rubber mat).Hot and cold asphalt,when fitted with optional water sprinkler system.
Optional accessories |
1. Foldable handle for easy transportation and stock
2. Trolley wheel provides ease with which the plate compactor can be transported
3.Rubber mat for brick paving compaction is available
4. Cast Iron plate or 65MN steel plate
5. Cast iron vibratory unit or aluminium vibratory unit
Optional Engine |
1. America B & S 5.0HP /6.5HP Gasoline engine
2. America Kohler CH260 6.0HP Gasoline engine
3. Japanese Subaru EX17 6.0HP Gasoline engine
Product Description |
Vibrating plate compactor for sale | |||
Model | C-80HD | C-80 HC | C-80RB |
Engine | Petrol,Honda GX160 5.5hp | Petrol, Chinese 168F 5.5hp | Petrol,Robin EY20 5.0hp |
Type of combustion | Air-cooled, single cylinder, 4-stroke | ||
Centrifugal force | 20KN | ||
Compaction depth | 30cm | ||
Size of base plate | L 530 × W 515mm | ||
Vibrating Frequency | 5500 vpm | ||
Travel Speed | 40 cm/s | ||
Efficiency | 660m2/hr | ||
G.W./N.W. | 96kgs /86kgs | ||
Shipping size | 90*52.5*71cm | ||
Product lead-time | 25 days |
PACKAGE |
FACTORY |
SAMPLE ROOM |
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|