Customization: | Available |
---|---|
Type: | Plate Compactor |
Working Method: | Vibration |
Still deciding? Get samples of US$ 221.07/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Uses |
Product Description |
Optional accessories |
Specification Date |
Plate compactor
|
|||||
Model |
C-60HD |
C-60RB |
C-60SB |
C-60BS |
C-60LF |
Engine type |
Air-cooled.4-cycle,single cylinder |
||||
Model |
Honda GX160 |
Robin EY20 |
Subaru EX17 |
Briggs & Stratton 1062 |
Lifan 168F |
Power of engine |
5.5HP |
5.0HP |
5.5HP |
5.0HP |
5.5HP |
Frequency |
5800 |
||||
Centrifugal Force |
10.5KN |
||||
Working of speed |
20 m/min (16 in/s) |
||||
Plate size |
530*350 mm |
||||
N.W/G.W.: |
69KGS/ 77KGS |
||||
Packing size |
790*480*720mm |
ASSEMBLY LINE |
PACKAGE |
FACTORY |
SAMPLE ROOM |
Hot Products |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|