Customization: | Available |
---|---|
Type: | Road Cutting Machine |
Object: | Asphalt Concrete Pavement |
Still deciding? Get samples of US$ 139.18/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
(QF300) Hot Sale Honda Gx160 Engine China Concrete Cutter Wholesale Manufacturer
The Concrete cutter QF-300 features wacker neuson design. It is lightweight and simple to operate. With a maximum cutting depth of 90mm .The machine is well suited for used on the concrete or asphalt floor .It comes with a polyurethane plastic water tank that is able to withstand wear and easy to be replaced.
Product Uses |
2. Concrete,asphalt pavement repairs cutting
3. All kinds of concrete cutting,grooving
Specification Date |
MODEL: | QF-300 | ||
ENGINE Model | Petro engine, HONDA GX160 | Petro engine, LIFAN 168F | Diesel engine, 170F |
POWER | 5.5HP | 6.5HP | 4.0HP |
Cutting Depth | 80mm | ||
Dia of blade | 250mm ~ 300mm | ||
Depth Adjustment | Handle Rotation | ||
Driving | Manual Push | ||
G.W./N.W. | 78/63KGS | 78/63KGS | 93/78KGS |
packing size | 97*55*96CM |
Optional Engine |
1.B&S 5HP/6.5HP 2. Kohler CH260 6.0HP
3. Robin EY20 5.0HP/SABARU EX17 6.0HP
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|