Customization: | Available |
---|---|
Type: | Concrete Vibrator |
Shotcrete Type: | Dry |
Still deciding? Get samples of US$ 209/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Hot Selling ! Honda GX35 1.5HP Portable concrete vibrator
Portable concrete vibrator ,work with 1~2mtr vibrator shaft, Is suitable to the commodity concrete, widely applies to the bridge, the harbor construction, the large-scale dam, the water wheel power plant, the high level building base pours into post picket, crowded reinforcing steel bar net coagulation dirt wall and major and medium small architectural engineering.
Engine model | Chinese 139F 1.9HP | Honda GX35 1.5HP | ||||
Engine type | Air-cooled,4-strokes | Air-cooled,4-strokes | ||||
Displacement | 31.0CC | 31.0CC | ||||
Ignition | CDI | CDI | ||||
Power | 1.9HP | 1.5HP | ||||
Fuel tank capacity | 1L | 1L | ||||
Weigth | 5.8kgs | 5.8kgs | ||||
Packing size | 133*42*33cm /2PCS | 133*42*33cm /2PCS | ||||
Match Flexible shaft | ||||||
Model: | ZX-35 | ZX-45 | ||||
shaft length | 1mtr | 1.5mtr | 2.0mtr | 1mtr | 1.5mtr | 2.0mtr |
Packing size (5pcs) | 105*21.5*5.5cm | 155*21.5*5.5cm | 205*21.5*5.5cm | 105*28.5*5.5cm | 155*28.5*5.5cm | 205*28.5*5.5cm |
Weigth | 3.14kgs | 3.9kgs | 4.66kgs | 4.4kgs | 5.4kgs | 6.4kgs |
Hot Products |
FAQ |
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|