Gasoline Power Helicopter Edging Finishing Float Machine Concrete Power
With Honda GX630 engine imported from Japan, stable performance, low maintenance. Construction efficiency can reach 4-5 sets of common power trowel.
Ride on concrete power trowel machine use for housing, warehouses, garages, industrial buildings and airports due to the continuous heavy load in such areas. Ride on trowels are also required for large warehouse construction projects and airports as they have greater requirements for the flat surfaces due to the safety and set-up requirements. KZW's range of power trowel offers you a cost efficient option to achieve a high quality finish and flat floor in a quicker time.
1. Twin stick, multi-directional steering system provides precision control and full maneuverability.
2. Dual mode non overlapping blades for RT836 provide a consistently smooth finish while clip-on float discs or disc pan floats can be attached for superior float operations.
3. Precision machined, tight tolerance spider plate assemblies provide exceptional balance and long life.
4. High speed for superior finishing.
5. Heavy duty gearboxes for long life and low maintenance.
6. Flip-up end rings facilitate efficient blade changes.
7. Flip-up seat reveals a sturdy lifting bale for ease of transport and to facilitate engine maintenance.
8. Adjustable operator's seat for greater comfort.
9. Standard light kit to improve visibility in poorly lit conditions.
Option: l Trolley Wheel
Model |
RT-836 |
Weight |
340 kgs (748lb ) |
Dimension |
1980*1020*1500 mm / 78*40*59 inch |
Working diameter |
1910 / 75 inch |
Speed |
150-155 rpm |
Engine |
Air-cooled, 4-cycle, Gasoline |
Type |
Honda GX630 |
Max. output |
16.5kw (22HP ) |
Max. speed |
3600 rpm |
Fuel Tank |
1.9 liters |
FAQ
1. Do you guarantee safe and secure delivery of products? Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge. |
2. Can you supply the relevant documentation? Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required. |
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.
|