Backpack Engine Vibrator (139F 1.9HP)

Product Details
Customization: Available
Type: Concrete Vibrator
Productivity: 35m²/h
Still deciding? Get samples of US$ 209/Piece
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2007

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (17)
  • Backpack Engine Vibrator (139F 1.9HP)
  • Backpack Engine Vibrator (139F 1.9HP)
  • Backpack Engine Vibrator (139F 1.9HP)
  • Backpack Engine Vibrator (139F 1.9HP)
  • Backpack Engine Vibrator (139F 1.9HP)
  • Backpack Engine Vibrator (139F 1.9HP)
Find Similar Products
  • Overview
  • FAQ
Overview

Basic Info.

Model NO.
139F
Vibrating Amplitude
1.2mm
Certification
CE
Condition
New
Item
Backpack Engine Vibrator
Engine
Honda Gx35
Power
1.5HP
Match Shaft
35~45mm
Match Shaft Length
1~2mtr
Transport Package
Carton
Specification
CE
Trademark
KZW
Origin
China
HS Code
84306100
Production Capacity
2000 PCS/Year

Packaging & Delivery

Package Size
133.00cm * 42.00cm * 33.00cm
Package Gross Weight
5.800kg

Product Description


Hot Selling !  Honda GX35 1.5HP Backpack engine vibrator


Product Uses:

Backpack engine vibrator ,work with 1~2mtr vibrator shaft, Is suitable to the commodity concrete, widely applies to the bridge, the harbor construction, the large-scale dam, the water wheel power plant, the high level building base pours into post picket, crowded reinforcing steel bar net coagulation dirt wall and major and medium small architectural engineering.


Specification Date:

Engine model
Chinese 139F  1.9HP Honda  GX35 1.5HP
Engine type Air-cooled,4-strokes Air-cooled,4-strokes
Displacement 31.0CC 31.0CC
Ignition CDI CDI
Power  1.9HP 1.5HP
Fuel tank capacity 1L 1L
Weigth 5.8kgs 5.8kgs
Packing size  133*42*33cm /2PCS 133*42*33cm /2PCS
Match Flexible shaft
Model:  ZX-35 ZX-45
shaft length 1mtr 1.5mtr 2.0mtr 1mtr 1.5mtr 2.0mtr
Packing size (5pcs) 105*21.5*5.5cm 155*21.5*5.5cm 205*21.5*5.5cm 105*28.5*5.5cm 155*28.5*5.5cm 205*28.5*5.5cm
Weigth 3.14kgs 3.9kgs 4.66kgs 4.4kgs 5.4kgs 6.4kgs


Backpack Engine Vibrator (139F 1.9HP)
Backpack Engine Vibrator (139F 1.9HP)
Backpack Engine Vibrator (139F 1.9HP)
Backpack Engine Vibrator (139F 1.9HP)


Backpack Engine Vibrator (139F 1.9HP)
 
Hot Products
Backpack Engine Vibrator (139F 1.9HP) Backpack Engine Vibrator (139F 1.9HP) Backpack Engine Vibrator (139F 1.9HP) Backpack Engine Vibrator (139F 1.9HP)
Excavator Surface Finishing Screed Concrete Vibrator Power Trowel
 
Backpack Engine Vibrator (139F 1.9HP)
 
Backpack Engine Vibrator (139F 1.9HP)
 
Backpack Engine Vibrator (139F 1.9HP)
 
Backpack Engine Vibrator (139F 1.9HP)
Remote Control Trowel Concrete Mixer Plate Compactor Compactor Machine
 
Backpack Engine Vibrator (139F 1.9HP)
 
Backpack Engine Vibrator (139F 1.9HP)
 
Backpack Engine Vibrator (139F 1.9HP)
Backpack Engine Vibrator (139F 1.9HP)
Drywall Sander Steel Bar Cutter Vibratory Roller Steel Bar Bender
FAQ

 

  
1. Do you guarantee safe and secure delivery of products?
Yes, we always use high quality export packaging. We also use specialized hazard packing for dangerous goods and validated cold storage shippers for temperature sensitive items. Specialist packaging and non-standard packing requirements may incur an additional charge.
 
2. Can you supply the relevant documentation?
Yes, we can provide most documentation including Certificates of Analysis / Conformance; Insurance; Origin, and other export documents where required.
 
3. What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times become effective when we have received your deposit, and we have your final approval for your products. If our lead times do not work with your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do so.








 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier